Freeport McMoRan Oil and Gas – Holstein Deep Tie-Back Project
The Holstein Deep Tie-Back Project consists of dual production flowlines and risers, jumpers, and umbilicals for a proposed subsea production manifold (three wells and one future well) in Block 643 – Green Canyon tied back to the (existing) Holstein SPAR in Block 645 – Green Canyon.
The work scope included project management, project controls, interface management, FEED, drafting services, materials management, and construction management. Major engineering elements included production and umbilical routing, flexible production risers and flowlines (by others), preliminary flowline design options, umbilical lines, and well and flowline jumpers.
CTI performed the Front End Engineering Design (FEED) for the well and flowline jumpers and routing of the dual production flowlines with engineering and project management responsibilities for this project, including the following:
- Provided Project Management and Project Controls Support
- Performed Front-End Engineering Design (FEED) Including:
- Preliminary Mechanical Design Report
- Design report Well Jumpers, Flowline Jumpers, Cathodic Protection
- Geotechnical analysis
- Production Flowline and Umbilical Route Selection
- Preparation of the Basis of Design and Final FEED Report
- Field Architecture for Flowlines, Jumpers, Umbilicals, and Subsea Structures
- Preliminary Bottom Roughness Analysis
- Keel Interface Design Fabrication Installation Operation (DFIO) Memo
- Preliminary Materials Selection Memo
- Line Length Procurement Contingency Philosophy Memo
- Provide Cost Estimates for the Flowlines, Jumpers, and Risers
- Provide input for the Project Schedule.
- Perform Drafting, Including:
- Field Layout
- Drill Center Detail
- Jumper Details
- System Schematic
- Safety Flow Schematic
- Riser Base PLET Layout
- SUTA to SUTA Connection Layout
- Dynamic-Static Umbilical Transition Layout
- Provide RFQ Packages for Flexible Pipe, Line Pipe, Geotechnical Survey, Geophysical Survey, and Installation.
Provide cost, schedule, and risk assessment memos for engineering component options including:
-
- Riser Options (Steel Lazy Wave Riser vs. Flexible)
- Flowline Options (PIP vs. Wet Insulated Rigid vs. Flexible)
- Jumpers (Rigid vs. Flexible)
- Bend Stiffener Connector
- Keel Interface