PROJECT CONTROLS

Cronus Technology, Inc. (CTI) has a highly experienced Project Controls team to assist and contribute to certifying the effectiveness and efficiency in executing a project.

 Budget and Cost Analysis

  • Compare actual resource utilizations with the budgeted amounts
  • Identify variances for study and mitigation
  • Man-hour reporting by deliverable and CTR
  • Cost reporting
  • Determine earned value based on agreed credit rules to define productivity

 Schedule Analysis

  • Track progress toward completion of deliverables
  • Project timing for completion of all deliverables
  • Define any variance in the critical path and float for the schedule

Document Control

  • Assign unique identification to each document or drawing following a client-issued numbering system and/or CTI’s standard numbering system
  • Transmit and receive documents on a controlled schedule
  • Log and specify the current location and status of each document
  • Maintain a Master Document Register for each project